R.S. Technologies
R.S. Technologies
Sector 6, Faridabad, Haryana
GST No. 06BHLPS1865E1Z4
TrustSEAL Verified
Call 0804897649458% Response Rate
SEND EMAIL

Effluent Treatment System

Our product range includes a wide range of 500 kld effluent treatment and wastewater treatment plant.

500 KLD Effluent Treatment And Wastewater Treatment Plant

500 KLD Effluent Treatment And Wastewater Treatment Plant
  • 500 KLD Effluent Treatment And Wastewater Treatment Plant
  • 500 KLD Effluent Treatment And Wastewater Treatment Plant
  • 500 KLD Effluent Treatment And Wastewater Treatment Plant
  • 500 KLD Effluent Treatment And Wastewater Treatment Plant
  • 500 KLD Effluent Treatment And Wastewater Treatment Plant
Get Best Quote
Approx. Price: Rs 2.5 Lakh / PieceGet Latest Price
Product Brochure

Product Details:

Minimum Order Quantity1 Piece
Installation TypePrefabricated
Capacity (KLD/MLD)500 KLD
Water Source TypeIndustrial Wastewater
Application IndustryPharmaceutical & Chemicals
Inlet Flow Rate(m3/day or m3/hr)500 m3/day
Usage/ApplicationWater Filtration
Treatment TechnologyMixed Bed Bio Reactor(MBBR)
Control ModuleAvailable
Automation GradeAutomatic
Deliver TypePAN India
Frequency50 Hz
Power SourceElectric
Treatment StagesPrimary Treatment, Secondary Treatment, Preliminary Treatment
Country of OriginMade in India

Effluent treatment plant, also known as ETP is a waste water treatment process (WWTP) that is used to treat wastewater. It's mostly used in industries like pharmaceuticals, textiles, and chemicals where extreme water contamination is a possibility. ETP plays a significant role in the treatment of industrial waste water as well as domestic sewage. The effluent treatment plant falls under this category as their common name  etp plant,  etp, effluent sewage treatment plants, common effluent treatment plant, Effluent Treatment Plant of Dairy, Effluent wastewater treatment plant, effluent treatment plant.

Organic matter, inorganic matter, heavy metals, oil & grease, suspended particles, and other contaminants are treated in the wastewater treatment process of an ETP plant. Chemical treatment, biological treatment, a combination of chemical and biological treatment, and thermal treatment are the several types of wastewater treatment plants.

How does ETP Plant Work?

The conceptual approach of the treatment includes the removal of suspended particles, dissolved organic matters and handling of sludge for disposal. Different processes involved are:

 

EQUALISATION: The equalization tank's purpose is to balance the raw effluent from various processing units. The wastewater is collected in an existing mixed effluent tank and pumped to an existing aeration tank, which also functions as an equalisation tank. The floating aerator is used to homogenise the effluent before it is pumped to the neutralization tank for treatment.

 

pH CONTROL: The pH value of effluent should be between 5.5 and 9.0, according to the Bureau of Indian Standards (BIS).pH neutralization is used to modify the pH of wastewater.

For waste that is acidic (low pH): Bases are used to modify the pH of a solution.

In the case of alkali waste (high pH): Acids are used to modify the pH of a solution.

COAGULATION: Coagulation is a technique that involves adding liquid aluminium sulphate to untreated water. This causes tiny dirt particles to stick together after mixing. This collection of particles combines to generate larger, heavier particles that are easily removed through settling and filtration.

SEDIMENTATION:  Water travels slowly in this process, causing the heavy particles to settle to the bottom. Sludge is the term for the particles that gather at the bottom of a container.

FILTRATION: Filtration is the process of passing water through a filter that removes particulates. The filters are made out of sand and gravel layers. Backwashing is required to clean these filters on a regular basis.

DISINFECTION: Before entering the distribution system, water is disinfected. Chlorine is used to disinfect and decontaminate water.

SLUDGE DRYING: Sedimentation collects and settles down solids, which are then transported to drying beds.  When the sludge thickness reaches around 300 mm, the sludge charging should be stopped, and the bed should be segregated to allow natural evaporation to dry it off. This takes approximately ten days. 

Request
Callback
Yes! I am Interested
X

Product Videos

Watch More Videos

Explore More Products

View All Products




Reach Us
Shiv Ram Sharma (Proprietor)
R.S. Technologies
Plot No. 78 Mujeri Industrial Area, Street No, 06
Sector 6, Faridabad - 121006, Haryana, India


Call Us


Send E-mail